- Quarterly UPS and generator service, semi-annual thermography, annual load bank test
- Response
- Power event acknowledged in 15 minutes; remote diagnosis within 1 hour; on-site within 4 business hours
Overview
AI training runs are unforgiving of power events: a multi-week job lost to a transient is far more expensive than the maintenance that would have prevented it. This product covers the whole distribution chain — incoming feed, switchgear, UPS plant, PDU, busway and the rack-level receptacle — with load banking and thermal imaging to catch degradation that normal inspection misses.
What is covered
- UPS plant: battery string impedance testing, capacitor inspection, fan and filter service, firmware currency review
- Generator and transfer switch exercise under load, with fuel quality sampling and polishing schedule
- Infrared thermography of switchgear, busbar joints, lugs and PDU terminations under representative load
- Load balancing across phases and circuits, with headroom analysis against planned accelerator additions
- PDU and busway inspection, torque verification, and receptacle wear assessment
- Power quality logging: harmonic distortion, voltage sag and swell, transient capture
- Earthing and bonding verification
Deliverables
- Single-line diagram annotated with as-found condition and measured loads
- Thermographic survey report with severity-ranked findings and photographic evidence
- Battery and capacitor replacement forecast with costed lead times
- Capacity headroom statement: what the facility can support today, and what constrains the next rack
Who this is for
Sites where a power transient would abort long-running training jobs, and where rack density is climbing faster than the original electrical design anticipated.
Specification
- Voltage classes
- 208/400/415/480 VAC distribution, 48 VDC and ±400 VDC rack bus
- UPS topologies
- Double-conversion, rotary, lithium-ion and VRLA strings
- Thermography standard
- Survey to recognised infrared thermography practice, severity-ranked
- Load bank testing
- Resistive and reactive, to nameplate and to measured facility load
- Power quality logging
- Continuous, with transient capture at 1-cycle resolution
Related services
| Service | Scope |
|---|---|
| Predictive Thermal & Cooling Maintenance | Keep high-density AI racks inside their thermal envelope before throttling costs you throughput. |
| Compliance & Audit Maintenance | Evidence produced continuously, so an audit is a retrieval exercise rather than a project. |